Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

The Second Horizontal Control Survey of the Booster Monument Network

Technical Report ·
DOI:https://doi.org/10.2172/1150595· OSTI ID:1150595
 [1];  [1]
  1. Brookhaven National Laboratory (BNL), Upton, NY (United States)

A network of survey control monuments, installed in the Booster tunnel, is used as a geodetic reference to define the locations of the Booster machine magnets in the tunnel. The horizontal positions of the monuments were established in the initial control survey, of July 1989, prior to installation of the magnets. In the autumn of 1990 additional radiation shielding was installed between the AGS and Booster machines, increasing floor loading in the area of installation. A second horizontal survey of the Booster ring was made between June and October 1990. The Booster ring magnets were initially installed and aligned using 1990 survey monument coordinates for alignment control. Results of the 1990 survey are reported here and are compared to those of the 1989 survey. A coherent monument shift pattern is observed, possibly due to shield load induced soil flow. Further survey work is suggested.

Research Organization:
Brookhaven National Laboratory (BNL), Upton, NY (United States)
Sponsoring Organization:
USDOE Office of Science (SC)
DOE Contract Number:
AC02-98CH10886
OSTI ID:
1150595
Report Number(s):
BNL--105261-2014-IR
Country of Publication:
United States
Language:
English

Similar Records

Design and First Control Survey of the Booster Monument Network and Modified Survey Marker Coordinates for the Booster Ring Magnets
Technical Report · Mon Mar 19 23:00:00 EST 1990 · OSTI ID:1150542

Coordinates of Magnet Survey Markers and Tunnel Survey Monuments for the AGS Booster
Technical Report · Tue Apr 26 00:00:00 EDT 1988 · OSTI ID:1150497

The October 1989 Survey of the Linac to Booster Transport Beam Line
Technical Report · Sat Jan 28 23:00:00 EST 1989 · OSTI ID:1150538

Related Subjects