Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Status of the SLAC/LBL/LLNL B-factory and the BABAR detector

Conference ·
OSTI ID:114570

After a brief introduction on the physics reach of the SLAC/LBL/LLNL Asymmetric B-Factory, the author describes the status of the accelerator and the detector as of the end of 1994. At this time, essentially all major decisions have been made, including the choice of particle identification for the detector. The author concludes this report with the description of the schedule for the construction of both accelerator and detector.

Research Organization:
Lawrence Berkeley Lab., CA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC03-76SF00098
OSTI ID:
114570
Report Number(s):
LBL--37307; CONF-9410248--5; ON: DE96001310
Country of Publication:
United States
Language:
English

Similar Records

Status of the SLAC/LBL/LLNL B-Factory and the BaBar detector
Conference · Mon Aug 01 00:00:00 EDT 1994 · OSTI ID:106627

Beam-beam studies for the proposed SLAC/LBL/LLNL B Factory
Conference · Wed May 01 00:00:00 EDT 1991 · OSTI ID:5462234

The BaBar detector at the SLAC B-Factory
Journal Article · Tue May 20 00:00:00 EDT 1997 · AIP Conference Proceedings · OSTI ID:21175381