Simulation of Transition and Transfer
- Brookhaven National Lab. (BNL), Upton, NY (United States)
This report presents results for a study where a γt jump, or a $$\dot{γ}$$ increase near transition is very helpful; a r.f. voltage of 300 kV for 26.7 MHz system helps in achieving $$\dot{γ}$$ increase, rotation and providing sufficient bucket area at low energy; and a second system of 160 MHz is comfortable for r.f. system transfer.
- Research Organization:
- Brookhaven National Lab. (BNL), Upton, NY (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC)
- DOE Contract Number:
- AC02-98CH10886
- OSTI ID:
- 1119129
- Report Number(s):
- BNL--101787-2013-IR
- Country of Publication:
- United States
- Language:
- English
Similar Records
Space charge effect at transition energy and the transfer of rf system at top energy
Beam Transfer AGS/RHIC, Low F - High F
Design of the 26.7 MHz rf cavity for RHIC
Conference
·
Thu Dec 31 23:00:00 EST 1987
·
OSTI ID:6841155
Beam Transfer AGS/RHIC, Low F - High F
Technical Report
·
Mon Jul 11 00:00:00 EDT 1988
·
OSTI ID:1119131
Design of the 26.7 MHz rf cavity for RHIC
Conference
·
Mon May 01 00:00:00 EDT 1995
·
OSTI ID:64341