COST-EFFECTIVE VISIBILITY-BASED DESIGN PROCEDURES FOR GENERAL OFFICE LIGHTING
Conference
·
OSTI ID:1109112
The concept of cost benefit analysis leads directly to the use of visual performance (i.e., the speed or accuracy with which a visual task is performed) rather than derived metrics such as ESI or VL as the basic visibility related performance parameter. The 1977 IES Design Committee's recommended specification procedure does not have visual performance in its formulation and hence will not lead to cost~effective general lighting designs. We discuss the direct calculation of average relative visual performance (RVP) and then present a reasonably accurate approximation which has significant advantages in speed and flexibility. Finally, we attempt to assess the conditions under which this procedure will provide useful information.
- Research Organization:
- Ernest Orlando Lawrence Berkeley National Laboratory, Berkeley, CA (US)
- Sponsoring Organization:
- Environmental Energy Technologies Division
- DOE Contract Number:
- AC02-05CH11231
- OSTI ID:
- 1109112
- Report Number(s):
- LBL-11863
- Country of Publication:
- United States
- Language:
- English
Similar Records
Cost-effective visibility-based design procedures for general office lighting
Cost effectiveness of visibility-based design procedures for general office lighting
Relating productivity to visibility and lighting
Journal Article
·
Wed Jul 01 00:00:00 EDT 1981
· J. Illum. Eng. Soc.; (United States)
·
OSTI ID:6727803
Cost effectiveness of visibility-based design procedures for general office lighting
Technical Report
·
Fri Aug 01 00:00:00 EDT 1980
·
OSTI ID:6728740
Relating productivity to visibility and lighting
Conference
·
Thu Dec 31 23:00:00 EST 1981
·
OSTI ID:5484227