Supplement to the UMTRA project water sampling and analysis plan, Slick Rock, Colorado
The water sampling and analysis plan (WSAP) provides the regulatory and technical basis for ground water and surface water sampling at the Uranium Mill Tailings Remedial Action (UMTRA) Project Union Carbide (UC) and North Continent (NC) processing sites and the Burro Canyon disposal site near Slick Rock, Colorado. The initial WSAP was finalized in August 1994 and will be completely revised in accordance with the WSAP guidance document (DOE, 1995) in late 1996. This version supplements the initial WSAP, reflects only minor changes in sampling that occurred in 1995, covers sampling scheduled for early 1996, and provides a preliminary projection of the next 5 years of sampling and monitoring activities. Once surface remedial action is completed at the former processing sites, additional and more detailed hydrogeologic characterization may be needed to develop the Ground Water Program conceptual ground water model and proposed compliance strategy. In addition, background ground water quality needs to be clearly defined to ensure that the baseline risk assessment accurately estimated risks from the contaminants of potential concern in contaminated ground water at the UC and NC sites.
- Research Organization:
- Jacobs Engineering Group, Inc., Albuquerque, NM (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC04-91AL62350
- OSTI ID:
- 109648
- Report Number(s):
- DOE/AL/62350--146S; ON: DE96000660
- Country of Publication:
- United States
- Language:
- English
Similar Records
Baseline risk assessment of ground water contamination at the uranium mill tailings sites near Slick Rock, Colorado
Supplement to the UMTRA Project water sampling and analysis plan, Maybell, Colorado