Land-Use Requirements for Solar Power Plants in the United States

Technical Report ·
DOI:https://doi.org/10.2172/1086349· OSTI ID:1086349
 [1];  [1];  [1];  [1];  [1]
  1. National Renewable Energy Laboratory (NREL), Golden, CO (United States)

This report provides data and analysis of the land use associated with utility-scale ground-mounted solar facilities, defined as installations greater than 1 MW. We begin by discussing standard land-use metrics as established in the life-cycle assessment literature and then discuss their applicability to solar power plants. We present total and direct land-use results for various solar technologies and system configurations, on both a capacity and an electricity-generation basis. The total area corresponds to all land enclosed by the site boundary. The direct area comprises land directly occupied by solar arrays, access roads, substations, service buildings, and other infrastructure. As of the third quarter of 2012, the solar projects we analyze represent 72% of installed and under-construction utility-scale PV and CSP capacity in the United States.

Research Organization:
National Renewable Energy Laboratory (NREL), Golden, CO (United States)
Sponsoring Organization:
USDOE Office of Energy Efficiency and Renewable Energy (EERE)
DOE Contract Number:
AC36-08GO28308
OSTI ID:
1086349
Report Number(s):
NREL/TP--6A20-56290
Country of Publication:
United States
Language:
English