Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

UMTRA project water sampling and analysis plan, Naturita, Colorado. Revision 1

Technical Report ·
DOI:https://doi.org/10.2172/108172· OSTI ID:108172

Planned, routine ground water sampling activities for calendar year 1995 to 1997 at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site near Naturita, Colorado, are described in this water sampling and analysis plan. The following plan identifies and justifies the sampling locations, analytical parameters, detection limits, sampling frequency, and specific rationale for each routine monitoring station at the site. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the US Environmental Protection Agency (EPA) regulations in 40 CFR Part 192. Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site.

Research Organization:
Jacobs Engineering Group, Inc., Albuquerque, NM (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC04-91AL62350
OSTI ID:
108172
Report Number(s):
DOE/AL/62350--121-Rev.1; ON: DE96000448
Country of Publication:
United States
Language:
English

Similar Records

UMTRA Project water sampling and analysis plan, Durango, Colorado. Revision 1
Technical Report · Fri Sep 01 00:00:00 EDT 1995 · OSTI ID:109443

UMTRA project water sampling and analysis plan, Maybell, Colorado
Technical Report · Wed Jun 01 00:00:00 EDT 1994 · OSTI ID:10162136

UMTRA project water sampling and analysis plan, Tuba City, Arizona
Technical Report · Wed Jan 31 23:00:00 EST 1996 · OSTI ID:196570