Site specific safety plan for interim action, Rocky Mountain Arsenal, basin F
Technical Report
·
OSTI ID:107923
This site specific safety plan (SSSP) presents the minimum health, safety, and emergency response requirements to be followed during all activities involved with the interim remediation actions at Basin F. These activities will involve handling hazardous and toxic materials. This plan discusses: (1) Suspected hazards at the site; (2) Work zones; (3) Protective equipment and clothing; (4) Decontamination; (5) Monitoring; (6) Medical surveillance; (7) Employee training; (8) Emergency response; and (9) Site background.
- Research Organization:
- Woodward-Clyde Consultants, Denver, CO (United States)
- OSTI ID:
- 107923
- Report Number(s):
- AD-A--292209/4/XAB
- Country of Publication:
- United States
- Language:
- English
Similar Records
Safety, health and emergency response plan, phase 1 site investigation and analysis. Basin f ground water treatment interim response action, Rocky Mountain Arsenal, Commerce City, Colorado
Rocky mountain arsenal, procedures manual to the technical plan. Volume 3. Project health and safety plan
EM Health and Safety Plan Guidelines
Technical Report
·
Wed Jun 01 00:00:00 EDT 1988
·
OSTI ID:147425
Rocky mountain arsenal, procedures manual to the technical plan. Volume 3. Project health and safety plan
Technical Report
·
Fri Aug 01 00:00:00 EDT 1986
·
OSTI ID:91492
EM Health and Safety Plan Guidelines
Technical Report
·
Wed Nov 30 23:00:00 EST 1994
·
OSTI ID:10104177