REQUEST FOR QUALIFICATION No. ADPM-002 PREQUALIFICATION CRITERIA Safety-Class Uninterruptable Power Supply General Contractor for the TA-55 TRP II Project Procurement Specialist: Robert Eubank Due Date: May 31, 2013
- Los Alamos National Laboratory
- Research Organization:
- Los Alamos National Laboratory (LANL), Los Alamos, NM (United States)
- Sponsoring Organization:
- DOE/LANL
- DOE Contract Number:
- AC52-06NA25396
- OSTI ID:
- 1077008
- Report Number(s):
- LA-UR-13-22926
- Country of Publication:
- United States
- Language:
- English
Similar Records
REQUEST FOR QUALIFICATION No. ADPM-001 PREQUALIFICATION CRITERIA Safety-Class Uninterruptable Power Supply Integrator for the TA-55 TRP II Project Procurement Specialist: Robert Eubank Due Date: May 31, 2013
50550: Waste Stream Profile, TA-55 TRP-III Fire System Replacement System-Concrete for Recycle
50608: Waste Stream Profile, TA-55 TRP-III Fire System Replacement System-Asphalt for Recycle
Technical Report
·
Mon Apr 29 00:00:00 EDT 2013
·
OSTI ID:1077008
50550: Waste Stream Profile, TA-55 TRP-III Fire System Replacement System-Concrete for Recycle
Technical Report
·
Thu May 19 00:00:00 EDT 2022
·
OSTI ID:1077008
50608: Waste Stream Profile, TA-55 TRP-III Fire System Replacement System-Asphalt for Recycle
Technical Report
·
Thu May 19 00:00:00 EDT 2022
·
OSTI ID:1077008