Independent Verification Survey Summary and Results for the Argonne National Laboratory Building 330 Project Footprint, Argonne, Illinois (Final Report)
- Oak Ridge Institute for Science and Education (ORISE), Oak Ridge, TN (United States)
ORISE conducted onsite verification activities of the Building 330 project footprint during the period of June 6 through June 7, 2011. The verification activities included technical reviews of project documents, visual inspections, radiation surface scans, and sampling and analysis. The draft verification report was issued in July 2011 with findings and recommendations. The contractor performed additional evaluations and remediation.
- Research Organization:
- Oak Ridge Institute for Science and Education (ORISE), Oak Ridge, TN (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Management (EM)
- DOE Contract Number:
- AC05-06OR23100
- OSTI ID:
- 1060174
- Report Number(s):
- 12-IEAV-1560; DCN--5121-SR-02-0
- Country of Publication:
- United States
- Language:
- English
Similar Records
Verification Survey of the Building 315 Zero Power Reactor-6 Facility, Argonne National Laboratory-East, Argonne, Illinois
INDEPENDENT VERIFICATION REVIEW AND SURVEY of the Argonne National Laboratory Building 301 Footprint
Independent Verification Survey of the High Flux Beam Reactor, Building 802 Fan House Brookhaven National Laboratory Upton, New York (Final Report)
Technical Report
·
Fri May 25 00:00:00 EDT 2007
·
OSTI ID:925702
INDEPENDENT VERIFICATION REVIEW AND SURVEY of the Argonne National Laboratory Building 301 Footprint
Technical Report
·
Wed May 26 00:00:00 EDT 2010
·
OSTI ID:1003748
Independent Verification Survey of the High Flux Beam Reactor, Building 802 Fan House Brookhaven National Laboratory Upton, New York (Final Report)
Technical Report
·
Thu Jun 23 20:00:00 EDT 2011
·
OSTI ID:1034268