Analysis Of DWPF Sludge Batch 7a (Macrobatch 8) Pour Stream Samples
The Defense Waste Processing Facility (DWPF) began processing Sludge Batch 7a (SB7a), also referred to as Macrobatch 8 (MB8), in June 2011. SB7a is a blend of the heel of Tank 40 from Sludge Batch 6 (SB6) and the SB7a material that was transferred to Tank 40 from Tank 51. SB7a was processed using Frit 418. During processing of each sludge batch, the DWPF is required to take at least one glass sample to meet the objectives of the Glass Product Control Program (GPCP), which is governed by the DWPF Waste Compliance Plan, and to complete the necessary Production Records so that the final glass product may be disposed of at a Federal Repository. Three pour stream glass samples and two Melter Feed Tank (MFT) slurry samples were collected while processing SB7a. These additional samples were taken during SB7a to understand the impact of antifoam and the melter bubblers on glass redox chemistry. The samples were transferred to the Savannah River National Laboratory (SRNL) where they were analyzed.
- Research Organization:
- Savannah River Site (SRS), Aiken, SC (United States)
- Sponsoring Organization:
- USDOE (United States)
- DOE Contract Number:
- AC09-08SR22470
- OSTI ID:
- 1053796
- Report Number(s):
- SRNL-STI--2012-00017-REVISION-1
- Country of Publication:
- United States
- Language:
- English
Similar Records
Analysis of DWPF Sludge Batch 7a (Macrobatch 8) Pour Stream Samples
Analysis of DWPF Sludge Batch 6 (Macrobatch 7) Pour Stream Glass Samples
Analysis of DWPF Sludge Batch 6 (Macrobatch 7): Pour Stream Glass Samples
Technical Report
·
Mon Apr 30 20:00:00 EDT 2012
·
OSTI ID:1039995
Analysis of DWPF Sludge Batch 6 (Macrobatch 7) Pour Stream Glass Samples
Technical Report
·
Fri Oct 28 00:00:00 EDT 2022
·
OSTI ID:1896450
Analysis of DWPF Sludge Batch 6 (Macrobatch 7): Pour Stream Glass Samples
Technical Report
·
Fri Sep 30 20:00:00 EDT 2022
·
OSTI ID:1035774