Summary of the Optics, IR, Injection, Operations, Reliability and Instrumentation Working Group
The facilities reported on are all in a fairly mature state of operation, as evidenced by the very detailed studies and correction schemes that all groups are working on. First- and higher-order aberrations are diagnosed and planned to be corrected. Very detailed beam measurements are done to get a global picture of the beam dynamics. More than other facilities the high-luminosity colliders are struggling with experimental background issues, mitigation of which is a permanent challenge. The working group dealt with a very wide rage of practical issues which limit performance of the machines and compared their techniques of operations and their performance. We anticipate this to be a first attempt. In a future workshop in this series, we propose to attempt more fundamental comparisons of each machine, including design parameters. For example, DAPHNE and KEKB employ a finite crossing angle. The minimum value of {beta}*{sub y} attainable at KEKB seems to relate to this scheme. Effectiveness of compensation solenoids and turn-by-turn BPMs etc. should be examined in more detail. In the near future, CESR-C and VEPP-2000 will start their operation. We expect to hear important new experiences from these machines; in particular VEPP-2000 will be the first machine to have adopted round beams. At SLAC and KEK, next generation B Factories are being considered. It will be worthwhile to discuss the design issues of these machines based on the experiences of the existing factory machines.
- Research Organization:
- SLAC National Accelerator Lab., Menlo Park, CA (United States)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC02-76SF00515
- OSTI ID:
- 1038694
- Report Number(s):
- SLAC-PUB-14959; TRN: US1202108
- Country of Publication:
- United States
- Language:
- English
Similar Records
ATF2 Summary and Status
Summary session B : more observations at existing accelerators and concerns for future machines.