Ultrasonic Examination of Double-Shell Tank 241-AY-101: Examination completed October 2007
- Pacific Northwest National Laboratory (PNNL), Richland, WA (United States)
AREVA NC Inc., under contract from CH2M Hill Hanford Group, has performed an ultrasonic examination of selected portions of Double-Shell Tank 241-AY-101. PNNL is responsible for preparing a report(s) that describes the results of the AREVA ultrasonic examinations. This report is Revision 1 - more data has been added to the original report. The purpose of this examination was to provide information that could be used to evaluate the integrity of the wall of the primary tank. The requirements for the ultrasonic examination of Tank 241-AY-101 were to detect, characterize (identify, size, and locate), and record measurements made of any wall thinning, pitting, or cracks that might be present in the wall of the primary tank. Any measurements that exceed the requirements set forth in the Engineering Task Plan, RPP-Plan-27202 (Jensen 2005) and summarized on page 1 of this document, are to be reported to CH2M Hill Hanford Group and the Pacific Northwest National Laboratory for further evaluation. Under the contract with CH2M Hill Hanford Group, all data is to be recorded on electronic media and paper copies of all measurements are provided to Pacific Northwest National Laboratory for third-party evaluation. Pacific Northwest National Laboratory is responsible for preparing a report(s) that describes the results of the AREVA NC Inc. ultrasonic examinations.
- Research Organization:
- Pacific Northwest National Laboratory (PNNL), Richland, WA (United States)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC05-76RL01830
- OSTI ID:
- 1034238
- Report Number(s):
- PNNL--16646-Rev.1; 830403000
- Country of Publication:
- United States
- Language:
- English
Similar Records
Ultrasonic Examination of Double-Shell Tank 241-AY-101. Examination Completed March 2007.
Ultrasonic Examination of Double-Shell Tank 241-AY-101 Examination Completed August 2003
Ultrasonic Examination of Double-Shell Tank 241-AZ-101: Examination Completed July 2007.
Technical Report
·
Fri Jun 01 00:00:00 EDT 2007
·
OSTI ID:908957
Ultrasonic Examination of Double-Shell Tank 241-AY-101 Examination Completed August 2003
Technical Report
·
Sun Nov 30 23:00:00 EST 2003
·
OSTI ID:15006898
Ultrasonic Examination of Double-Shell Tank 241-AZ-101: Examination Completed July 2007.
Technical Report
·
Tue Jul 31 20:00:00 EDT 2007
·
OSTI ID:1034241