Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

D0 Silicon Upgrade: Cryogenic Line Routing: Refrigerator to VLPC Cryostats & Solenoid

Technical Report ·
DOI:https://doi.org/10.2172/1033318· OSTI ID:1033318
 [1]
  1. Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
This engineering note documents the proposed cryogenic line routing from the liquid helium (LHe) refrigeration plant to the detector solenoid and VLPC cryostats. Many figures are included to aid in understanding the route. As an appendix, I include some general comments relevant to the topic. Also listed are a number of routing options that were considered before the proposed route was finalized.
Research Organization:
Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1033318
Report Number(s):
FERMILAB-D0-EN--413
Country of Publication:
United States
Language:
English

Similar Records

D0 Silicon Upgrade: Pipe Sizing for Solenoid / VLPC Cryogenic Systems
Technical Report · Sun Jun 25 20:00:00 EDT 1995 · OSTI ID:1033315

D0 Cryogenic System Superconducting Solenoid Platform I/O
Technical Report · Thu Oct 09 00:00:00 EDT 1997 · OSTI ID:1032124

D0 Silicon Upgrade: Transfer Line Branch Considerations for Solenoid & VLPC
Technical Report · Thu Jun 15 20:00:00 EDT 1995 · OSTI ID:1033307