D0 Silicon Upgrade: ASME Code and Pressure Calculations for Liquid Nitrogen Subcooler
- Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
Included in this engineering note are three separate calculation divisions. The first calculations are the determination of the required thickness of the LN2 subcooler flat head according to ASME code. This section includes Appendix A-C. The minimum plate thickness determined was 0.563 in. The actual thickness chosen in fabrication was a 3/4-inch plate milled to 0.594-inch at the bolt circle. Along with the plate thickness, this section calculates the required reinforcement area at the top plate penetrations. It was found that a 1/4-inch fillet weld at each penetration was adequate. The next set of calculations were done to prove that the subcooler internal pressure will always be less than 15 psig and therefore will not be classified as a pressure vessel. The subcooler is always open to a vent pipe. Appendix D calculations show that the vent pipe has a capacity of 1042 lbs/hr if 15 psig is present at the subcooler. It goes on to show that the inlet piping would at that flow rate, see a pressure drop of 104 psig. The maximum supply pressure of the LN2 storage dewar is 50 psig. Appendix E addresses required flow rates for steady state, loss of vacuum, or fire conditions. Page E9 shows a summary which states the maximum pressure would be 1.50 psig at fire conditions and internal pressure.
- Research Organization:
- Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1033296
- Report Number(s):
- FERMILAB-D0-EN--435
- Country of Publication:
- United States
- Language:
- English
Similar Records
Liquid Nitrogen Subcooler Pressure Vessel Engineering Note
D0 Silicon Upgrade: Liquid Nitrogen Subcooler Coil Sizing for D-Zero Upgrade
Control Dewar Subcooler Heat Exchanger Calculations
Technical Report
·
Thu Apr 24 00:00:00 EDT 1997
·
OSTI ID:1032130
D0 Silicon Upgrade: Liquid Nitrogen Subcooler Coil Sizing for D-Zero Upgrade
Technical Report
·
Mon Oct 02 20:00:00 EDT 1995
·
OSTI ID:1033297
Control Dewar Subcooler Heat Exchanger Calculations
Technical Report
·
Mon Oct 04 00:00:00 EDT 1993
·
OSTI ID:1031783