Refrigerator and Solenoid Run Summary August/September 1999

Technical Report ·
DOI:https://doi.org/10.2172/1032092· OSTI ID:1032092

The helium refrigerator was cooled down and operated for the third time since its installation. D-Zero's 2 Tesla superconducting solenoid was cooled down and operated for its second time since its installation into the D-Zero detector. This engineering note summarizes the cryogenic aspects of the test run and performance measurements made. The main purpose of this run was to do field mapping of the solenoid with different combinations of field polarity on the Solenoid and CF iron magnets. This was accomplished. A second purpose was to test the lower field joint repair that was done in January 1999. This field joint had a measurable voltage drop across the soldered bus splice. The repair was an undoing of the joint, extensive cleaning of the bus, and then welding the splice. The repair was successful, no voltage drop was measured and the magnet behaved nicely. A parasitic purpose was to get some operating time on the refrigerator, measure the refrigeration performance, and measure the heat leak in the VLPC lines mounted on the detector platform. Refrigerator performance was spot checked, and was found to be 60 watts (10%) less than generic operating curves. At this level of performance, the operating margin for the full solenoid and VLPC system will be 75 watts (15%) which is somewhat uncomfortable from an operational stand point. The VLPC lines were operated and heat leak numbers of around 40 watts was measured for each pipe section including the supply u-tubes to the detector, the bayonet can, valve box on the platform and the piping back to the refrigerator valve box. Another purpose of the test run was to test the compatibility of other detector components with the new central magnetic field environment. I do not know the results of these tests.

Research Organization:
Fermi National Accelerator Laboratory (FNAL), Batavia, IL
Sponsoring Organization:
DOE Office of Science
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1032092
Report Number(s):
FERMILAB-D0-EN-514
Country of Publication:
United States
Language:
English

Similar Records

D0 Silicon Upgrade: Liquid & Gas Nitrogen Line Sizing for D-Zero Upgrade
Technical Report · Wed Sep 13 20:00:00 EDT 1995 · OSTI ID:1033300

Commissioning Test Results for D-Zero's Helium Refrigerator
Technical Report · Sun Jun 29 20:00:00 EDT 1997 · OSTI ID:1033274

D0 Silicon Upgrade: Calc. to Determine Need for a N2 Phase Separator