Deflection of the CC Cryostat Head Under Vacuum Loading
Following the installation of modules, cables and other equipment into the DO central cryostat (CC cryostat) the small clearance between the cryostat head and internal equipment caused concern that the head would make contact with the equipment when the cryostat was put under vacuum for leak checking. This finite element analysis was requested by George Mulholland to determine the amount of deflection in the head due to vacuum loads.
- Research Organization:
- Fermi National Accelerator Laboratory (FNAL), Batavia, IL
- Sponsoring Organization:
- DOE Office of Science
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1031839
- Report Number(s):
- FERMILAB-D0-EN-256
- Country of Publication:
- United States
- Language:
- English
Similar Records
Design and Test of the CC Cryostat Head Cart
D-Zero Collider Detector CC Initial Vacuum Pumping Preparation and Procedure
CC Cryostat Vacuum Pumping Efficiency
Technical Report
·
Tue Aug 08 00:00:00 EDT 1989
·
OSTI ID:1031171
D-Zero Collider Detector CC Initial Vacuum Pumping Preparation and Procedure
Technical Report
·
Mon Apr 08 00:00:00 EDT 1991
·
OSTI ID:1031808
CC Cryostat Vacuum Pumping Efficiency
Technical Report
·
Tue Oct 13 00:00:00 EDT 1987
·
OSTI ID:1030703