The SuperB Accelerator: Overview and Lattice Studies
Conference
·
· Proceedings of 40th Advanced Beam Dynamics Workshop on e+e- Factories:66-70,2008
OSTI ID:1029907
SuperB aims at the construction of a very high luminosity (10{sup 36} cm{sup -2} s{sup -1}) asymmetric e{sup +}e{sup -} Flavour Factory, with possible location at the campus of the University of Rome Tor Vergata, near the INFN Frascati National Laboratory. In this paper the basic principles of the design and details on the lattice are given. SuperB is a new machine that can exploit novel very promising design approaches: (1) large Piwinski angle scheme will allow for peak luminosity of the order of 10{sup 36} cm{sup -2} s{sup -1}, well beyond the current state-of-the-art, without a significant increase in beam currents or shorter bunch lengths; (2) 'crab waist' sextupoles will be used for suppression of dangerous resonances; (3) the low beam currents design presents reduced detector and background problems, and affordable operating costs; (4) a polarized electron beam can produce polarized {tau} leptons, opening an entirely new realm of exploration in lepton flavor physics. SuperB studies are already proving useful to the accelerator and particle physics communities. The principle of operation is being tested at DAFNE. The baseline lattice, based on the reuse of all PEP-II hardware, fits in the Tor Vergata University campus site, near Frascati. A CDR is being reviewed by an International Review Committee, chaired by J. Dainton (UK). A Technical Design Report will be prepared to be ready by beginning of 2010.
- Research Organization:
- SLAC National Accelerator Laboratory (SLAC)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC02-76SF00515
- OSTI ID:
- 1029907
- Report Number(s):
- SLAC-PUB-14767
- Conference Information:
- Journal Name: Proceedings of 40th Advanced Beam Dynamics Workshop on e+e- Factories:66-70,2008
- Country of Publication:
- United States
- Language:
- English
Similar Records
Site Studies for the SuperB Collider and Synchrotron Radiation Facility Project
The Super-B Project Accelerator Status
SuperB Bunch-By-Bunch Feedback R&D
Conference
·
Thu Apr 26 00:00:00 EDT 2012
·
OSTI ID:1039173
The Super-B Project Accelerator Status
Conference
·
Wed Aug 17 00:00:00 EDT 2011
· Conf.Proc.C100523:tupeb003,2010
·
OSTI ID:1022528
SuperB Bunch-By-Bunch Feedback R&D
Conference
·
Fri Aug 12 00:00:00 EDT 2011
· Conf.Proc.C100523:wepeb034,2010
·
OSTI ID:1022586