System Verification Through Reliability, Availability, Maintainability (RAM) Analysis & Technology Readiness Levels (TRLs)
Conference
·
OSTI ID:1027894
The Next Generation Nuclear Plant (NGNP) Project, managed by the Idaho National Laboratory (INL), is authored by the Energy Policy Act of 2005, to research, develop, design, construct, and operate a prototype fourth generation nuclear reactor to meet the needs of the 21st Century. A section in this document proposes that the NGNP will provide heat for process heat applications. As with all large projects developing and deploying new technologies, the NGNP is expected to meet high performance and availability targets relative to current state of the art systems and technology. One requirement for the NGNP is to provide heat for the generation of hydrogen for large scale productions and this process heat application is required to be at least 90% or more available relative to other technologies currently on the market. To reach this goal, a RAM Roadmap was developed highlighting the actions to be taken to ensure that various milestones in system development and maturation concurrently meet required availability requirements. Integral to the RAM Roadmap was the use of a RAM analytical/simulation tool which was used to estimate the availability of the system when deployed based on current design configuration and the maturation level of the system.
- Research Organization:
- Idaho National Laboratory (INL)
- Sponsoring Organization:
- DOE - NE
- DOE Contract Number:
- AC07-05ID14517
- OSTI ID:
- 1027894
- Report Number(s):
- INL/CON-10-20342
- Country of Publication:
- United States
- Language:
- English
Similar Records
Reducing Risk for the Next Generation Nuclear Plant
NGNP – Creating Validated TRL and TDRMs for Critical Systems, Subsystems, and Components
Roadmapping – A Systematic Approach to Overcoming NGNP Challenges
Conference
·
Thu Jul 01 00:00:00 EDT 2010
·
OSTI ID:986949
NGNP – Creating Validated TRL and TDRMs for Critical Systems, Subsystems, and Components
Technical Report
·
Mon Sep 01 00:00:00 EDT 2008
·
OSTI ID:950984
Roadmapping – A Systematic Approach to Overcoming NGNP Challenges
Conference
·
Mon Sep 01 00:00:00 EDT 2008
·
OSTI ID:940054