Construction of AC Motor Controllers for NOvA Experiment Upgrades
I have been constructing Alternating Current (AC) motor controllers for manipulation of particle beam detectors. The capability and reliability of these motor controllers are essential to the Laboratory's mission of accurate analysis of the particle beam's position. The device is moved in and out of the beam's path by the motor controller followed by the Neutrinos at the Main Injector Off-Axis {nu}{sub e} Appearance (NOvA) Experiment further down the beam pipe. In total, I built and tested ten ac motor controllers for new beam operations in the NOvA experiment. These units will prove to be durable and provide extremely accurate beam placement for NOvA Experiment far into the future.
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC)
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1027476
- Report Number(s):
- FERMILAB-TM-2512-AD; TRN: US1105785
- Country of Publication:
- United States
- Language:
- English
Similar Records
Comparison of oscillation parameters measured from $\nu_\mu$ and $\bar{\nu}_\mu$ disappearance in the NOvA experiment
DAQ Software Contributions, Absolute Scale Energy Calibration and Background Evaluation for the NOvA Experiment at Fermilab
Data Driven Trigger Design and Analysis for the NOvA Experiment
Thesis/Dissertation
·
Tue Oct 01 00:00:00 EDT 2019
·
OSTI ID:1027476
DAQ Software Contributions, Absolute Scale Energy Calibration and Background Evaluation for the NOvA Experiment at Fermilab
Thesis/Dissertation
·
Sat Aug 01 00:00:00 EDT 2015
·
OSTI ID:1027476
Data Driven Trigger Design and Analysis for the NOvA Experiment
Thesis/Dissertation
·
Fri Jan 01 00:00:00 EST 2016
·
OSTI ID:1027476