Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

HOM Survey of the First CEBAF Upgrade Style Cavity Pair

Conference ·
OSTI ID:1021855
The planned upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) at the Thomas Jefferson National Accelerator Laboratory (JLab) requires ten new superconducting rf (SRF) cavity cryomodules to double the beam energy to the envisaged 12 GeV. Adequate cavity Higher Order Mode (HOM) suppression is essential to avoid multipass, multibunch beam break-up (BBU) instabilities of the recirculating beam. We report on detailed HOM surveys performed for the first two upgrade style cavities tested in a dedicated cavity pair cryomodule at 2K. The safety margin to the BBU threshold budget at 12 GeV has been assessed.
Research Organization:
Thomas Jefferson National Accelerator Facility, Newport News, VA (United States)
Sponsoring Organization:
USDOE Office of Science (SC)
DOE Contract Number:
AC05-06OR23177
OSTI ID:
1021855
Report Number(s):
JLAB-ACC-09-983; DOE/OR/23177-0728
Country of Publication:
United States
Language:
English

Similar Records

Critical dipole modes in JLAB upgrade cavities
Conference · Wed Sep 01 00:00:00 EDT 2010 · OSTI ID:1183214

Multipass Beam Breakup Study at Jefferson Lab for the 12 Ge V CEBAF U pgrade
Thesis/Dissertation · Wed May 01 00:00:00 EDT 2013 · OSTI ID:1924854

Recirculating Beam Breakup Study for the 12 GeV Upgrade at Jefferson Lab
Conference · Sun Jul 01 00:00:00 EDT 2012 · OSTI ID:1047533