Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Performance of the new EBIS preinjector

Conference ·
OSTI ID:1020951
The construction and initial commissioning phase of a new heavy ion preinjector was completed at Brookhaven in September, 2010, and the preinjector is now operational. This preinjector, using an EBIS source to produce high charge state heavy ions, provided helium and neon ion beams for use at the NASA Space Radiation Laboratory in the Fall of 2010, and gold and uranium beams are being commissioned during the 2011 run cycle for use in RHIC. The EBIS operates with an electron beam current of up to 10 A, to produce mA level currents in 10-40 {micro}s beam pulses. The source is followed by an RFQ and IH linac to accelerate ions with q/m > 0.16 to an energy of 2 MeV/amu, for injection into the Booster synchrotron. The performance of the preinjector is presented, including initial operational experience for the NASA and RHIC programs.
Research Organization:
Brookhaven National Laboratory (BNL) Electron Beam Ion Source
Sponsoring Organization:
DOE - OFFICE OF SCIENCE
DOE Contract Number:
AC02-98CH10886
OSTI ID:
1020951
Report Number(s):
BNL--94248-2011-CP; KB0202011
Country of Publication:
United States
Language:
English

Similar Records

END-TO-END SIMULATIONS FOR THE EBIS PREINJECTOR.
Conference · Mon Jun 25 00:00:00 EDT 2007 · OSTI ID:921931

Commissioning of the EBIS-based heavy ion preinjector at Brookhaven
Conference · Sun Sep 12 00:00:00 EDT 2010 · OSTI ID:1020952

Construction of the BNL EBIS preinjector
Conference · Mon May 04 00:00:00 EDT 2009 · OSTI ID:962171