Novel ultracapacitor electrodes for high power applications. SBIR Phase 1 final technical report
Technical Report
·
OSTI ID:10201579
- Research Organization:
- Technical Research Associates, Inc., Salt Lake City, UT (United States)
- Sponsoring Organization:
- USDOE Office of Energy Research, Washington, DC (United States)
- DOE Contract Number:
- FG03-96ER82293
- OSTI ID:
- 10201579
- Type / Phase:
- SBIR
- Report Number(s):
- DOE/ER/82293-T1; ON: TI97021047; TRN: AHC29906%%81
- Resource Relation:
- Other Information: PBD: 22 Jan 1998
- Country of Publication:
- United States
- Language:
- English
Similar Records
Development of multiple beam guns for high power RF applications. SBIR Phase 1 final report
A novel separation method based on the electrosynthesis of dual oxidants. SBIR Phase 1 final technical report
Advanced electrical safety components for alternate energy power systems; SBIR Phase 1, Final technical report
Technical Report
·
Fri May 01 00:00:00 EDT 1998
·
OSTI ID:10201579
A novel separation method based on the electrosynthesis of dual oxidants. SBIR Phase 1 final technical report
Technical Report
·
Mon Apr 13 00:00:00 EDT 1998
·
OSTI ID:10201579
+1 more
Advanced electrical safety components for alternate energy power systems; SBIR Phase 1, Final technical report
Technical Report
·
Wed May 01 00:00:00 EDT 1991
·
OSTI ID:10201579