Title: Advanced coal-fueled industrial cogeneration gas turbine system particle removal system development

Technical Report ·
DOI:https://doi.org/10.2172/10194325· OSTI ID:10194325

Solar Turbines developed a direct coal-fueled turbine system (DCFT) and tested each component in subscale facilities and the combustion system was tested at full-scale. The combustion system was comprised of a two-stage slagging combustor with an impact separator between the two combustors. Greater than 90 percent of the native ash in the coal was removed as liquid slag with this system. In the first combustor, coal water slurry mixture (CWM) was injected into a combustion chamber which was operated loan to suppress NO{sub x} formation. The slurry was introduced through four fuel injectors that created a toroidal vortex because of the combustor geometry and angle of orientation of the injectors. The liquid slag that was formed was directed downward toward an impaction plate made of a refractory material. Sixty to seventy percent of the coal-borne ash was collected in this fashion. An impact separator was used to remove additional slag that had escaped the primary combustor. The combined particulate collection efficiency from both combustors was above 95 percent. Unfortunately, a great deal of the original sulfur from the coal still remained in the gas stream and needed to be separated. To accomplish this, dolomite or hydrated lime were injected in the secondary combustor to react with the sulfur dioxide and form calcium sulfite and sulfates. This solution for the sulfur problem increased the dust concentrations to as much as 6000 ppmw. A downstream particulate control system was required, and one that could operate at 150 psia, 1850-1900{degrees}F and with low pressure drop. Solar designed and tested a particulate rejection system to remove essentially all particulate from the high temperature, high pressure gas stream. A thorough research and development program was aimed at identifying candidate technologies and testing them with Solar`s coal-fired system. This topical report summarizes these activities over a period beginning in 1987 and ending in 1992.

Research Organization:
Solar Turbines, Inc., San Diego, CA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC21-86MC23166
OSTI ID:
10194325
Report Number(s):
DOE/MC/23166-3869; ON: DE94012294; TRN: 94:010369
Resource Relation:
Other Information: PBD: Mar 1994
Country of Publication:
United States
Language:
English

Similar Records

Advanced coal-fueled gas turbine systems. Final report
Technical Report · Sun Aug 01 00:00:00 EDT 1993 · OSTI ID:10194325

Two-stage slagging combustor design for a coal-fueled industrial gas turbine
Journal Article · Wed Apr 01 00:00:00 EST 1992 · Journal of Engineering for Gas Turbines and Power; (United States) · OSTI ID:10194325

Advanced coal-fueled industrial cogeneration gas turbine system
Technical Report · Mon Jun 01 00:00:00 EDT 1992 · OSTI ID:10194325