Installation and initial operation of the DIII-D advanced divertor cryocondensation pump
Conference
·
OSTI ID:10190778
- General Atomics, San Diego, CA (United States)
- Oak Ridge National Lab., TN (United States)
Phase two of a divertor cryocondensation pump, the Advanced Divertor Program, is now installed in the DIII-D tokamak at General Atomics and complements the phase one biasable ring electrode. The installation consists of a 10 m long cryocondensation pump located in the divertor baffle chamber to study plasma density control by pumping of the divertor. The design is a toroidally electrically continuous liquid helium-cooled panel with 1 m{sup 2} of pumping surface. The helium panel is single point grounded to the nitrogen shield to minimize eddy currents. The nitrogen shield is toroidally continuous and grounded to the vacuum vessel in 24 locations to prevent voltage potentials from building up between the pump and vacuum vessel wall. A radiation/particle shield surrounds the nitrogen-cooled surface to minimize the heat load and prevent water molecules condensed on the nitrogen surface from being released by impact of energetic particles. Large currents (>5000 A) are driven in the helium and nitrogen panels during ohmic coil ramp up and during disruptions. The pump is designed to accommodate both the thermal and mechanical loads due to these currents. A feedthrough for the cryogens allows for both radial and vertical motion of the pump with respect to the vacuum vessel. Thermal performance measured on a prototype verified the analytical model and thermal design of the pump. Characterization tests of the installed pump show the pumping speed in deuterium is 42,000 {ell}/sec for a pressure of 5 mTorr. Induction heating of the pump (at 300 W) resulted in no degradation of pumping speed. Plasma operations with the cryopump show a 60% lower density in H-mode.
- Research Organization:
- General Atomics, San Diego, CA (United States); Oak Ridge National Lab., TN (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC03-89ER51114; AC05-84OR21400
- OSTI ID:
- 10190778
- Report Number(s):
- GA-A--21396; CONF-931018--20; ON: DE94001106
- Country of Publication:
- United States
- Language:
- English
Similar Records
Transient thermal analysis of cryocondensation pump for JET
Transient thermal analysis of cryocondensation pump for JET
Design and Analysis of the Cryopump for the DIII-D Upper Divertor
Conference
·
Fri Dec 30 23:00:00 EST 1994
·
OSTI ID:47818
Transient thermal analysis of cryocondensation pump for JET
Conference
·
Sun Aug 01 00:00:00 EDT 1993
·
OSTI ID:10186132
Design and Analysis of the Cryopump for the DIII-D Upper Divertor
Conference
·
Sun Oct 31 23:00:00 EST 1999
·
OSTI ID:766697