RF feedback simulation for the PEP-II B Factory
Conference
·
OSTI ID:10190562
A model, of the beam and RF system for PEP-11 has been developed to allow both time-domain simulation and frequency-domain analysis of the complete system. The model includes the full set of feedback loops and nonlinear elements such as the beam and klystron. The model may be used to predict beam and feedback stability in the presence of nonlinearities through time-domain simulation as well as system frequency response about a given operating point.
- Research Organization:
- Stanford Linear Accelerator Center, Menlo Park, CA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC03-76SF00515
- OSTI ID:
- 10190562
- Report Number(s):
- SLAC-PUB--6535; CONF-940618--83; ON: DE95001489
- Country of Publication:
- United States
- Language:
- English
Similar Records
RF feedback simulation results for PEP-II
RF feedback development for the PEP-II B Factory
RF system design for the PEP-II B Factory
Conference
·
Thu Jun 01 00:00:00 EDT 1995
·
OSTI ID:104980
RF feedback development for the PEP-II B Factory
Conference
·
Wed Jun 01 00:00:00 EDT 1994
·
OSTI ID:10194037
RF system design for the PEP-II B Factory
Conference
·
Wed Jun 01 00:00:00 EDT 1994
·
OSTI ID:10194040