Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Second year operation of the Tidd PFBC Demonstration Plant

Technical Report ·
DOI:https://doi.org/10.2172/10190544· OSTI ID:10190544
The Tidd PFBC Demonstration Plant is the first utility-scale PFBC demonstration project in the United States. Its objective is to demonstrate that the pressurized fluidized bed combustion (PFBC) combined-cycle technology is a cost effective, reliable, and environmentally acceptable alternative to conventional coal fired electric power generation using flue gas desulfurization. The project will demonstrate PFBC technology on a large scale for use in commercial combined-cycle electric generating plants. The program will demonstrate has turbine survivability and controllability; process performance in removing oxides of sulfur and minimizing the formation of oxides of nitrogen; equipment and system performance and reliability. This paper reviews problems encountered during the first year of unit operation, the modifications made during an outage in the Fall of 1991 to correct these problems, and the post outage operating experiences through July 1992.
Research Organization:
Ohio Power Co., Columbus, OH (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
FC21-87MC24132
OSTI ID:
10190544
Report Number(s):
DOE/MC/24132--92/C0079; CONF-921037--6; ON: DE93002152
Country of Publication:
United States
Language:
English

Similar Records

Second year operation of the Tidd PFBC Demonstration Plant
Conference · Tue Dec 31 23:00:00 EST 1991 · OSTI ID:7191807

Start-up of the Tidd PFSC demonstration plant
Conference · Mon Dec 31 23:00:00 EST 1990 · Proceedings of the American Power Conference; (United States) · OSTI ID:5107926

Tidd PFBC Demonstration Project. Final report, March 1, 1994--March 30, 1995
Technical Report · Tue Aug 01 00:00:00 EDT 1995 · OSTI ID:188533