Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Baseline risk assessment for groundwater contamination at the uranium mill tailings site near Monument Valley, Arizona. Draft

Technical Report ·
DOI:https://doi.org/10.2172/10189426· OSTI ID:10189426
This baseline risk assessment evaluates potential impact to public health or the environment resulting from groundwater contamination at the former uranium mill processing site near Monument Valley, Arizona. The tailings and other contaminated material at this site are being relocated and stabilized in a disposal cell at Mexican Hat, Utah, through the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The tailings removal is planned for completion by spring 1994. After the tailings are removed, groundwater contamination at the site will continue to be evaluated. This risk assessment is the first document specific to this site for the Groundwater Project. It will be used to assist in determining what remedial action is needed for contaminated groundwater at the site.
Research Organization:
Jacobs Engineering Group, Inc., Albuquerque, NM (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC04-91AL62350
OSTI ID:
10189426
Report Number(s):
DOE/AL/62350--43D; ON: DE94001510; BR: EW2010102/EX2040010
Country of Publication:
United States
Language:
English