Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

The long-pulse, high-current relativistic klystron at 500 MW and beyond

Conference ·
OSTI ID:10187103

This paper describes the development of an L-band annular beam, high-current relativistic klystron for producing a peak power of 1 GW at a pulse length of 1 {mu}s. The tube consists of three cavities: the input cavity driven by a 300 kW magnetron, an idler cavity, and an output cavity. The tube has produced 475 MW and an energy per pulse of 160 J. The microwave output pulse terminates prematurely, before the peak power in the electron beam pulse is reached. The pulse shortening is believed to be caused by too high a voltage across the gap of the output cavity. The result is electron reflection in the output gap leading to beam disruption and high voltage breakdown across the gap. Current experimental results are presented with an emphasis on the design of output cavities for coupling microwave power from high current, very low impedance modulated electron beams.

Research Organization:
Los Alamos National Lab., NM (United States)
Sponsoring Organization:
Department of Defense, Washington, DC (United States)
DOE Contract Number:
W-7405-ENG-36
OSTI ID:
10187103
Report Number(s):
LA-UR--94-3279; CONF-9405243--1; ON: DE95000845
Country of Publication:
United States
Language:
English

Similar Records

One microsecond pulse-width annular beam relativistic klystron operating at 500 MW
Book · Fri Dec 30 23:00:00 EST 1994 · OSTI ID:63056

A 500 MW, 1 [mu]s pulse length, high current relativistic klystron
Journal Article · Sat Oct 01 00:00:00 EDT 1994 · IEEE Transactions on Plasma Science (Institute of Electrical and Electronics Engineers); (United States) · OSTI ID:6797467

A 500 MW annular beam relativistic klystron
Conference · Sat Oct 01 00:00:00 EDT 1994 · OSTI ID:10187112