Environmental Restoration Program pollution prevention checklist guide for the feasibility study project phase

Technical Report ·
DOI:https://doi.org/10.2172/10186969· OSTI ID:10186969
Feasibility studies (FS) determine what remedial alternatives are presented to regulators for site cleanup. A key consideration in this process is the waste to be generated. Minimizing the volume and toxicity of this waste will ultimately contribute to the selection of the best remedial option. The purpose of this checklist guide is to assist the user in incorporating pollution prevention/waste minimization (PP/WM) in all FS phase projects of the Environmental Restoration (ER) Program. This guide will help users document PP/WM activities for technology transfer and reporting requirements. Automated computer screens will be created from the checklist data to assist users with implementing and evaluating waste reduction. Users can then establish numerical performance measures to measure progress in planning, training, self-assessments, field implementation, documentation, and technology transfer. Cost savings result as users train and assess themselves and perform preliminary waste assessments.
Research Organization:
Martin Marietta Energy Systems, Inc., Oak Ridge, TN (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC05-84OR21400; AC05-76OR00001
OSTI ID:
10186969
Report Number(s):
ES/ER/TM--89; ON: DE94001033
Country of Publication:
United States
Language:
English