Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Effects of parasitic beam-beam interaction during the injection process at the PEP-II B Factory

Conference ·
OSTI ID:10185018
This paper is concerned with beam-beam effects during the injection process at the proposed asymmetric SLAC/LBL/LLNL B-Factory, PEP-II. It is shown that the parasitic beam-beam interaction can lead to a significant blowup in the vertical size of the injected beam. Simulation results for the horizontal and the vertical injection schemes are presented, and their performances are studied.
Research Organization:
Lawrence Livermore National Lab., CA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC03-76SF00098
OSTI ID:
10185018
Report Number(s):
LBL--32468; ESG--194; CONF-9204126--12; ON: DE92041171
Country of Publication:
United States
Language:
English