Safety evaluation for packaging transportation of equipment for tank 241-C-106 waste sluicing system
A Waste Sluicing System (WSS) is scheduled for installation in nd waste storage tank 241-C-106 (106-C). The WSS will transfer high rating sludge from single shell tank 106-C to double shell waste tank 241-AY-102 (102-AY). Prior to installation of the WSS, a heel pump and a transfer pump will be removed from tank 106-C and an agitator pump will be removed from tank 102-AY. Special flexible receivers will be used to contain the pumps during removal from the tanks. After equipment removal, the flexible receivers will be placed in separate containers (packagings). The packaging and contents (packages) will be transferred from the Tank Farms to the Central Waste Complex (CWC) for interim storage and then to T Plant for evaluation and processing for final disposition. Two sizes of packagings will be provided for transferring the equipment from the Tank Farms to the interim storage facility. The packagings will be designated as the WSSP-1 and WSSP-2 packagings throughout the remainder of this Safety Evaluation for Packaging (SEP). The WSSP-1 packagings will transport the heel and transfer pumps from 106-C and the WSSP-2 packaging will transport the agitator pump from 102-AY. The WSSP-1 and WSSP-2 packagings are similar except for the length.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-87RL10930
- OSTI ID:
- 10182507
- Report Number(s):
- WHC-SD-TP-SEP--024; ON: DE94018680; BR: 35AF11201/35AF11202
- Country of Publication:
- United States
- Language:
- English
Similar Records
Review of Waste Retrieval Sluicing System Operations and Data for Tanks 241-C-106 and 241-AY-102
Tank 241-C-106 waste retrieval sluicing system process control plan
Waste compatibility assessments to support project W-320
Technical Report
·
Tue Sep 26 00:00:00 EDT 2000
·
OSTI ID:965194
Tank 241-C-106 waste retrieval sluicing system process control plan
Technical Report
·
Sat Jul 25 00:00:00 EDT 1998
·
OSTI ID:362429
Waste compatibility assessments to support project W-320
Technical Report
·
Tue Apr 06 00:00:00 EDT 1999
·
OSTI ID:781685