Horizontal oil well applications and oil recovery assessment. Technical progress report, April--June 1994
Thousands of horizontal wells are being drilled each year in the U.S.A. and around the world. Horizontal wells have increased oil and gas production rates 3 to 8 times those of vertical wells in many areas and have converted non-economic oil reserves to economic reserves. However, the use of horizontal technology in various formation types and applications has not always yielded anticipated success. The primary objective of this project is to examine factors affecting technical and economic success of horizontal well applications. The project`s goals will be accomplished through six tasks designed to evaluate the technical and economic success of horizontal drilling, highlight current limitations, and outline technical needs to overcome these limitations. Data describing operators` experiences throughout the domestic oil and gas industry will be gathered and organized. Canadian horizontal technology will also be documented with an emphasis on lessons the US industry can learn from Canada`s experience. MEI databases containing detailed horizontal case histories will also be used. All these data will be categorized and analyzed to assess the status of horizontal well technology and estimate the impact of horizontal wells on present and future domestic oil recovery and reserves.
- Research Organization:
- Maurer Engineering, Inc., Houston, TX (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC22-93BC14861
- OSTI ID:
- 10182201
- Report Number(s):
- DOE/BC/14861--4; ON: DE94018806
- Country of Publication:
- United States
- Language:
- English
Similar Records
Horizontal oil well applications and oil recovery assessment. Technical progress report-final, July 1994--September 1994
Horizontal oil well applications and oil recovery assessment. Technical progress report, January--March 1994
Horizontal oil well applications and oil recovery assessment. Technical progress report, July--September 1993
Technical Report
·
Fri Dec 02 23:00:00 EST 1994
·
OSTI ID:10108572
Horizontal oil well applications and oil recovery assessment. Technical progress report, January--March 1994
Technical Report
·
Wed Jun 01 00:00:00 EDT 1994
·
OSTI ID:10160497
Horizontal oil well applications and oil recovery assessment. Technical progress report, July--September 1993
Technical Report
·
Tue Nov 30 23:00:00 EST 1993
·
OSTI ID:10106414