Title: Preliminary assessment report for Army Aviation Support Facility No. 3, Installation 13307, Hunter Army Airfield, Savannah, Georgia. Installation Restoration Program

Abstract

This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Georgia Army National Guard property located on Hunter Army Airfield (HAA) near Savannah, Georgia, known as Army Aviation Support Facility (AASF) No. 3. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, types and quantities of hazardous substances utilized, the nature and amounts of wastes generated or stored at the facility, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the AASF No. 3 property, requirements of the Department of Defense Installation Restoration Program (IRP). The scope of this assessment is limited to the facilities and past activities contained within the area now occupied by AASF No. 3. However, this assessment report is intended to be read in conjunction with a previous IRP assessment of HAA completed in 1992 (USATHAMA 1992) and to provide comprehensive information on AASFmore » No. 3 for incorporation with information contained in that previous assessment for the entirety of HAA.« less

Authors:
;
Publication Date:
Research Org.:
Argonne National Lab., IL (United States)
Sponsoring Org.:
Department of Defense, Washington, DC (United States)
OSTI Identifier:
10181444
Report Number(s):
IR-CR-93072
ON: DE93019475; TRN: 93:020031
DOE Contract Number:
W-31109-ENG-38
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: Jul 1993
Country of Publication:
United States
Language:
English
Subject:
54 ENVIRONMENTAL SCIENCES; HAZARDOUS MATERIALS; ENVIRONMENTAL TRANSPORT; MILITARY FACILITIES; SITE CHARACTERIZATION; US DOD; GEORGIA; RISK ASSESSMENT; HEALTH HAZARDS; PUBLIC HEALTH; SURFACE WATERS; GROUND WATER; SOILS; ORGANIC COMPOUNDS; 540220; 540320; 540250; CHEMICALS MONITORING AND TRANSPORT; SITE RESOURCE AND USE STUDIES

Citation Formats

Kolpa, R., and Smith, K. Preliminary assessment report for Army Aviation Support Facility No. 3, Installation 13307, Hunter Army Airfield, Savannah, Georgia. Installation Restoration Program. United States: N. p., 1993. Web. doi:10.2172/10181444.
Kolpa, R., & Smith, K. Preliminary assessment report for Army Aviation Support Facility No. 3, Installation 13307, Hunter Army Airfield, Savannah, Georgia. Installation Restoration Program. United States. doi:10.2172/10181444.
Kolpa, R., and Smith, K. Thu . "Preliminary assessment report for Army Aviation Support Facility No. 3, Installation 13307, Hunter Army Airfield, Savannah, Georgia. Installation Restoration Program". United States. doi:10.2172/10181444. https://www.osti.gov/servlets/purl/10181444.
@article{osti_10181444,
title = {Preliminary assessment report for Army Aviation Support Facility No. 3, Installation 13307, Hunter Army Airfield, Savannah, Georgia. Installation Restoration Program},
author = {Kolpa, R. and Smith, K.},
abstractNote = {This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Georgia Army National Guard property located on Hunter Army Airfield (HAA) near Savannah, Georgia, known as Army Aviation Support Facility (AASF) No. 3. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, types and quantities of hazardous substances utilized, the nature and amounts of wastes generated or stored at the facility, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the AASF No. 3 property, requirements of the Department of Defense Installation Restoration Program (IRP). The scope of this assessment is limited to the facilities and past activities contained within the area now occupied by AASF No. 3. However, this assessment report is intended to be read in conjunction with a previous IRP assessment of HAA completed in 1992 (USATHAMA 1992) and to provide comprehensive information on AASF No. 3 for incorporation with information contained in that previous assessment for the entirety of HAA.},
doi = {10.2172/10181444},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Thu Jul 01 00:00:00 EDT 1993},
month = {Thu Jul 01 00:00:00 EDT 1993}
}

Technical Report:

Save / Share:
  • This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Massachusetts Army National Guard (MAARNG) property known as the Army Aviation Support Facility 2 (AASF 2) near Chicopee, Massachusetts. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathwaysmore » by which contamination could affect public health and the environment. The AASF 2 is a 10-acre site located in the western portion of Massachusetts, in the town of Chicopee, in the county of Hampden. The facilities included in this PA are Building 7400, adjacent paved areas, grassy areas, and the hazardous waste drum storage buildings. The environmentally significant operations (ESOS) associated with the property are (1) the waste drum storage area, (2) abandoned underground storage tanks (USTs), and (3) refueling activities.« less
  • The Hazardous Materials Technical Center (HMTC) was retained in May 1987 to conduct the Installation-Restoration Program (IRP) Preliminary Assessment of the 165th Tactical Airlift Group (TAG) and the Savannah Permanent Field Training Site (PTFS) of the Georgia Air National Guard (ANG), Savannah International Airport, Savannah, Georgia (hereinafter referred to as the Base). The Preliminary Assessment included: an onsite Base visit, including interviews with 26 past and present base employees and conducted by HMTC personnel during 18-21 May 1987; the acquisition and analysis of pertinent information and records on the use of hazardous material and generation and disposal of hazardous wastemore » at the Base; the acquisition and analysis of available geologic, hydrologic, meteorologic, and environmental data from pertinent Federal and State agencies; and the identification of sites on the Base which may be potentially contaminated with hazardous material/hazardous waste (HM/HW).« less
  • This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Virginia Army National Guard (VaARNG) property in Sandston, Virginia. The Army Aviation Support Facility (AASF) is contiguous with the Richmond International Airport. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The PA is designed to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathwaysmore » by which contamination could affect public health and the environment. The AASF, originally constructed as an active Air Force interceptor base, provides maintenance support for VaARNG aircraft. Hazardous materials used and stored at the facility include JP-4 jet fuel, diesel fuel, gasoline, liquid propane gas, heating oil, and motor oil.« less
  • This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Georgia Army National Guard (GAARNG) facility near Hinesville, Georgia, known as the National Guard Training Center (NGTC). Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a priority basis for completing corrective actions (where necessary) in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining previous site activities, types and quantities of hazardous substancesmore » utilized, and potential pathways by which contamination could affect public health and the environment. The scope of this assessment is limited to the facilities and past activities contained within the NGTC. Preliminary assessment site score sheet information is also provided for the NGTC. However, this assessment report is intended to be read in conjunction with a previous IRP assessment of Fort Stewart completed in 1992 (USATHAMA 1992) and to provide comprehensive information on the NGTC area for incorporation with information contained in that previous assessment for the entirety of Fort Stewart.« less
  • This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Washington Army National Guard (WAARNG) property in Redmond, Washington. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment.more » This PA satisfies, for the Redmond ARNG property, Phase I of the Department of Defense Installation Restoration Program. The environmentally significant operations (ESOs) associated with the property are (1) supply/storage of hazardous materials, (2) weapons cleaning, (3) the underground storage tanks (USTs), and (4) the use of herbicides. These ESOs are no longer active because of the closure of OMS 10 activities in 1988.« less