Work plan for ground water elevation data recorder/monitor well injection at Grand Junction, Colorado
The purpose of this document is to describe the work that will be performed and the procedures that will be followed during installation of ground water monitor wells and ground water elevation data recorders (data loggers) at the Grand Junction, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. The monitor wells and data loggers will be used to gather required time-dependent data to investigate the interaction between the shallow aquifer and the Colorado River. Data collection objectives (DCO) identify reasons for collecting data. The following are DCOs for the Grand Junction ground water elevation data recorder/monitor well installation project: long-term continuous ground water level data and periodic ground water samples will be collected to better understand the relationship between surface and ground water at the site; water level and water quality data will eventually be used in future ground water modeling to more firmly establish boundary conditions in the vicinity of the Grand Junction processing site; modeling results will be used to demonstrate and document the potential remedial alternative of natural flushing.
- Research Organization:
- Jacobs Engineering Group, Inc., Albuquerque, NM (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC04-91AL62350
- OSTI ID:
- 10180720
- Report Number(s):
- DOE/AL/62350--138; ON: DE94018462; BR: EW2010102/EX2040010
- Country of Publication:
- United States
- Language:
- English
Similar Records
Work plan for ground water elevation data recorder/monitor well installation at Gunnison, Colorado
Work plan for ground water elevation data recorder/monitor well installation at Gunnison, Colorado. Revision 1
Work plan for ground water elevation data recorder/monitor well installation at Grand Junction, Colorado. Revision 1
Technical Report
·
Mon Jul 18 00:00:00 EDT 1994
·
OSTI ID:10180717
Work plan for ground water elevation data recorder/monitor well installation at Gunnison, Colorado. Revision 1
Technical Report
·
Mon Aug 01 00:00:00 EDT 1994
·
OSTI ID:10180513
Work plan for ground water elevation data recorder/monitor well installation at Grand Junction, Colorado. Revision 1
Technical Report
·
Mon Aug 01 00:00:00 EDT 1994
·
OSTI ID:10180508