INDEPENDENT TECHNICAL REVIEW OF THE FOCUSED FEASIBILITY STUDY AND PROPOSED PLAN FOR DESIGNATED SOLID WASTE MANAGEMENT UNITS CONTRIBUTING TO THE SOUTHWEST GROUNDWATER PLUME AT THE PADUCAH GASEOUS DIFFUSION PLANT
The U. S. Department of Energy (DOE) is currently developing a Proposed Plan (PP) for remediation of designated sources of chlorinated solvents that contribute contamination to the Southwest (SW) Groundwater Plume at the Paducah Gaseous Diffusion Plant (PGDP), in Paducah, KY. The principal contaminants in the SW Plume are trichloroethene (TCE) and other volatile organic compounds (VOCs); these industrial solvents were used and disposed in various facilities and locations at PGDP. In the SW plume area, residual TCE sources are primarily in the fine-grained sediments of the Upper Continental Recharge System (UCRS), a partially saturated zone that delivers contaminants downward into the coarse-grained Regional Gravel Aquifer (RGA). The RGA serves as the significant lateral groundwater transport pathway for the plume. In the SW Plume area, the four main contributing TCE source units are: (1) Solid Waste Management Unit (SWMU) 1 / Oil Landfarm; (2) C-720 Building TCE Northeast Spill Site (SWMU 211A); (3) C-720 Building TCE Southeast Spill Site (SWMU 211B); and (4) C-747 Contaminated Burial Yard (SWMU 4). The PP presents the Preferred Alternatives for remediation of VOCs in the UCRS at the Oil Landfarm and the C-720 Building spill sites. The basis for the PP is documented in a Focused Feasibility Study (FFS) (DOE, 2011) and a Site Investigation Report (SI) (DOE, 2007). The SW plume is currently within the boundaries of PGDP (i.e., does not extend off-site). Nonetheless, reasonable mitigation of the multiple contaminant sources contributing to the SW plume is one of the necessary components identified in the PGDP End State Vision (DOE, 2005). Because of the importance of the proposed actions DOE assembled an Independent Technical Review (ITR) team to provide input and assistance in finalizing the PP.
- Research Organization:
- SRS
- Sponsoring Organization:
- DOE
- DOE Contract Number:
- AC09-08SR22470
- OSTI ID:
- 1017433
- Report Number(s):
- SRNL-STI-2011-00290
- Country of Publication:
- United States
- Language:
- English
Similar Records
Technical Evaluation of Temporal Groundwater Monitoring Variability in MW66 and Nearby Wells, Paducah Gaseous Diffusion Plant
Independent technical review of the c-400 interim remedial project phase I results, paducah, kentucky
Superfund record of decision (EPA Region 4): Paducah Gaseous Diffusion Plant (USDOE), Operable Unit 15, Paducah, KY, August 10, 1998
Technical Report
·
Tue Jul 31 20:00:00 EDT 2012
·
OSTI ID:1049526
Independent technical review of the c-400 interim remedial project phase I results, paducah, kentucky
Technical Report
·
Thu Oct 28 20:00:00 EDT 2010
·
OSTI ID:1043262
Superfund record of decision (EPA Region 4): Paducah Gaseous Diffusion Plant (USDOE), Operable Unit 15, Paducah, KY, August 10, 1998
Technical Report
·
Mon Nov 30 23:00:00 EST 1998
·
OSTI ID:350666