Report to Congress: Comprehensive Program Plan for Advanced Turbine Systems
Consistent with the Department of Energy (DOE) mission, the Advanced Turbine Systems (ATS) Program will develop more efficient gas turbine systems for both utility and industrial electric power generation (including cogeneration). The Program will develop base-load power systems for commercial offering in the year 2000. Although the target fuel is natural gas, the ATS will be adaptable to coal and biomass firing. All ATS will exhibit these characteristics: Ultra-high efficiency [utility systems: 60 percent (lower heating value basis); industrial systems: 15 percent improvement over today`s best gas turbine systems]; Environmental superiority [reduced nitrogen oxides (NO{sub x}), carbon dioxide (CO{sub 2}), carbon monoxide (CO), and unburned hydrocarbons (UHC)]; and Cost competitiveness [10 percent lower cost of electricity]. This Program Plan was requested in the House, Senate, and Conference Reports on the FY 1993 Interior and Related Agencies Appropriations Act, Public Law 102--381, and is consistent with the Energy Policy Act of 1992, which (in Section 2112) identifies work for improving gas turbines. This plan outlines the 8-year ATS Program and discusses rationale and planning. Total Program costs are estimated to be $700 million, consisting of an approximate $450 million government share and an approximate $250 million cost-share by industrial participants.
- Research Organization:
- USDOE Assistant Secretary for Fossil Energy, Washington, DC (United States); USDOE Assistant Secretary for Energy Efficiency and Renewable Energy, Washington, DC (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- OSTI ID:
- 10172881
- Report Number(s):
- DOE/FE--0279; ON: DE93016718; NC: NONE
- Country of Publication:
- United States
- Language:
- English
Similar Records
Program to develop advanced gas turbine systems
Advanced gas turbine systems program
Allison engine ATS program technical review
Conference
·
Fri Jul 01 00:00:00 EDT 1994
·
OSTI ID:10162895
Advanced gas turbine systems program
Conference
·
Thu Jun 01 00:00:00 EDT 1995
·
OSTI ID:426206
Allison engine ATS program technical review
Conference
·
Sat Dec 30 23:00:00 EST 1995
·
OSTI ID:219518
Related Subjects
20 FOSSIL-FUELED POWER PLANTS
200100
200102
33 ADVANCED PROPULSION SYSTEMS
330103
AIR POLLUTION CONTROL
BIOMASS
CARBON DIOXIDE
CARBON MONOXIDE
COST
DESIGN
ELECTRIC POWER
FUEL GAS
GAS TURBINES
HYDROCARBONS
NATURAL GAS
NITROGEN OXIDES
POWER CYCLES
POWER PLANTS AND POWER GENERATION
RESEARCH PROGRAMS
THERMAL EFFICIENCY
TURBINE
200100
200102
33 ADVANCED PROPULSION SYSTEMS
330103
AIR POLLUTION CONTROL
BIOMASS
CARBON DIOXIDE
CARBON MONOXIDE
COST
DESIGN
ELECTRIC POWER
FUEL GAS
GAS TURBINES
HYDROCARBONS
NATURAL GAS
NITROGEN OXIDES
POWER CYCLES
POWER PLANTS AND POWER GENERATION
RESEARCH PROGRAMS
THERMAL EFFICIENCY
TURBINE