Interim Test Procedures for Evaluating Electrical Performance and Grid Integration of Vehicle-to-Grid Applications
The objective of this report is to provide a test plan for V2G testing. The test plan is designed to test and evaluate the vehicle's power electronics capability to provide power to the grid, and to evaluate the vehicle's ability to connect and disconnect from the utility according to a subset of the IEEE Std. 1547 tests.
- Research Organization:
- National Renewable Energy Laboratory (NREL), Golden, CO (United States)
- Sponsoring Organization:
- USDOE Office of Energy Efficiency and Renewable Energy (EERE)
- DOE Contract Number:
- AC36-08GO28308;
- OSTI ID:
- 1017107
- Report Number(s):
- NREL/TP-5500-51001
- Country of Publication:
- United States
- Language:
- English
Similar Records
Grid Interconnection and Performance Testing Procedures for Vehicle-To-Grid (V2G) Power Electronics: Preprint
Grid Code Essentials and Streamlining Process for Interconnections
Background Information on the Protection Requirements in IEEE Std 1547-2018
Conference
·
Wed Feb 29 19:00:00 EST 2012
·
OSTI ID:1039795
Grid Code Essentials and Streamlining Process for Interconnections
Conference
·
Tue Nov 10 19:00:00 EST 2020
·
OSTI ID:1721742
Background Information on the Protection Requirements in IEEE Std 1547-2018
Technical Report
·
Sun Jan 02 19:00:00 EST 2022
·
OSTI ID:1839049