Description of work for 216-U-1 and 216-U-2 stainless steel pipeline integrity testing

Technical Report ·
DOI:https://doi.org/10.2172/10169419· OSTI ID:10169419
The objectives of this integrity test are to (1) inspect the interior of this pipeline by in-line camera survey and (2) if required, conduct a pressure test on a section of the pipeline. The U-1 and U-2 Cribs were constructed in 1951. From March 1952 to June 1967, the site received cell drainage from Tank 5-2 in the 221-U Building nd waste from the 224-U Building via the overflow from the 241-U-361 Settling Tank. From June 1957 to July 1957, the site received waste from the 224-U Building via the overflow from the 241-U-361 Settling Tank and contaminated solvent from the 276-U Settling Tank solvent storage area. The discharge of 221-U waste was discontinued during shutdown of production operations. From July 1957 to May 1967, the site received waste from the 224-U Building and equipment decontamination and reclamation wastes from operations in the 221-U Building canyon. The scope of work is encompassed in five steps: (1) obtaining access to the pipeline in order to perform an in-line camera survey of the line to the greatest extent possible, (2) evaluating the need for further investigation of the pipeline, (3) blanking the line, as needed, to perform a pressure test, (4) conducting the pressure test, as needed, and (5) documenting the ability of the line to maintain pressure.
Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-87RL10930
OSTI ID:
10169419
Report Number(s):
WHC-SD-EN-AP--166; ON: DE94015706; BR: 35AF11201/35AF11202
Country of Publication:
United States
Language:
English