Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Standardizing instream flow requirements at hydropower projects in the Cascade Mountains, Washington

Conference ·
OSTI ID:10169123
Instream flow requirements are common mitigation measures instituted in the bypassed reaches of hydroelectric diversion projects. Currently, there are two extremes among the ways to determine instream flow requirements: generic standard-setting methods and detailed, habitat-based, impact assessment methods such as the Instream Flow Incremental Methodology (IFIM). Data from streams in Washington state show a consistent pattern in the instream flow requirements resulting from the IFIM. This pattern can be used to refine the simpler standard-setting approaches and thereby provide better estimates of flow needs during early stages of project design.
Research Organization:
Oak Ridge National Lab., TN (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States); USDOE Federal Energy Regulatory Commission, Washington, DC (United States)
DOE Contract Number:
AC05-84OR21400
OSTI ID:
10169123
Report Number(s):
CONF-930870--3; ON: DE93015968
Country of Publication:
United States
Language:
English

Similar Records

Nonlinear optimization of instream flow requirements for hydropower projects
Conference · Sat Dec 30 23:00:00 EST 1995 · OSTI ID:219935

Habitat modeling in a southeastern aluvial floodplain river
Conference · Sat Dec 30 23:00:00 EST 1995 · OSTI ID:219931

Evaluating effects of proposed instream flow releases for hydroelectric projects
Journal Article · Sat Jun 01 00:00:00 EDT 1991 · Hydro Review; (United States) · OSTI ID:5570354