Implementation of MC&A performance testing at the Savannah River Site
This paper describes the implementation of material control and accountability (MC&A) performance testing requirements at the Savannah River Site. Department of Energy (DOE) Order 5633.3A, CONTROL AND ACCOUNTABILITY OF NUCLEAR MATERIALS, provides selected MC&A elements requiring performance testing as well as the minimum performance requirements. MC&A Performance Testing Programs must also meet the requirements of DOE Order 5630.16A, SAFEGUARDS AND SECURITY ACCEPTANCE AND VALIDATION TESTING PROGRAM. This paper describes how WSRC MC&A is implementing requirements from both 5633.3A and 5630.16A within the MC&A Performance Testing Program, and how the MC&A Program fits into the site wide SSAVT Program. This paper will also describe the collaboration of MC&A testing with security testing and vulnerability analysis testing to eliminate redundancy and enable the applicable requirements to be met in a cost effective manner.
- Research Organization:
- Westinghouse Savannah River Co., Aiken, SC (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC09-89SR18035
- OSTI ID:
- 10169118
- Report Number(s):
- WSRC-MS--94-0104; CONF-940748--8; ON: DE94015591
- Country of Publication:
- United States
- Language:
- English
Similar Records
Formation of a performance-based MC and A assessment program
Formation of a performance-based MC&A assessment program