Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Increasing the energy of the Fermilab Tevatron accelerator

Conference ·
OSTI ID:10168893
The superconducting Tevatron accelerator at Fermilab has reached its eleventh year of operation since being commissioned in 1983. Last summer, four significant upgrades to the cryogenic system became operational which allow Tevatron operation at higher energy. This came after many years of R&D, power testing in sectors (one sixth) of the Tevatron, and final system installation. The improvements include the addition of cold helium vapor compressors, supporting hardware for subatmospheric operation, a new satellite refrigerator control system, and a higher capacity central helium liquefier. A description of each cryogenic upgrade, commissioning experience, and attempts to increase the energy of the Tevatron are presented.
Research Organization:
Fermi National Accelerator Lab., Batavia, IL (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC02-76CH03000
OSTI ID:
10168893
Report Number(s):
FNAL/C--94/192; CONF-940618--21; ON: DE94015539
Country of Publication:
United States
Language:
English

Similar Records

Upgrade of the Tevatron cryogenic system
Conference · Fri Dec 30 23:00:00 EST 1994 · OSTI ID:45443

Tevatron lower temperature operation
Technical Report · Fri Jul 01 00:00:00 EDT 1994 · OSTI ID:10173938

Twenty Years of Tevatron Operation
Conference · Thu Jul 15 00:00:00 EDT 2004 · OSTI ID:825898