Report on Production Test No. 313-68-M: Recanning of warped slugs segregated after the centrifuge by technical warp gauge
Abstract
It has been found that warped slugs which produce ``non-seats`` segregated after the centrifuging operation by use of a suitable gauge. The slugs which do not pass the gauge are quenched in water and set aside for later recovery. The purpose of this test was to determine if the rejected slugs could be straightened, degreased and recanned by dipping them directly in the bronze and then through the subsequent steps. One hundred and twenty-nine slugs rejected by the warp gauge were straightened, degreased and recanned by dipping directly into the bronze bath, Eleven non-seats and one Al-Si spill over were rejected at the canning pot.The above procedure is recommended as a possible means of treating slugs rejected in the canning operation because of wrap.
- Publication Date:
- Research Org.:
- Du Pont de Nemours (E.I.) and Co., Aiken, SC (United States). Savannah River Lab.
- Sponsoring Org.:
- USDOE, Washington, DC (United States)
- OSTI Identifier:
- 10167659
- Report Number(s):
- SR/H-750
ON: DE94015372
- DOE Contract Number:
- AC09-76SR00001
- Resource Type:
- Technical Report
- Resource Relation:
- Other Information: PBD: 20 Apr 1945
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 22 GENERAL STUDIES OF NUCLEAR REACTORS; FUEL RODS; CANNING; HANFORD PRODUCTION REACTORS; FABRICATION; COATINGS; BRONZE; 220600; 220300; RESEARCH, TEST, TRAINING, PRODUCTION, IRRADIATION, MATERIALS TESTING REACTORS; FUEL ELEMENTS
Citation Formats
Not Available. Report on Production Test No. 313-68-M: Recanning of warped slugs segregated after the centrifuge by technical warp gauge. United States: N. p., 1945.
Web. doi:10.2172/10167659.
Not Available. Report on Production Test No. 313-68-M: Recanning of warped slugs segregated after the centrifuge by technical warp gauge. United States. doi:10.2172/10167659.
Not Available. Fri .
"Report on Production Test No. 313-68-M: Recanning of warped slugs segregated after the centrifuge by technical warp gauge". United States.
doi:10.2172/10167659. https://www.osti.gov/servlets/purl/10167659.
@article{osti_10167659,
title = {Report on Production Test No. 313-68-M: Recanning of warped slugs segregated after the centrifuge by technical warp gauge},
author = {Not Available},
abstractNote = {It has been found that warped slugs which produce ``non-seats`` segregated after the centrifuging operation by use of a suitable gauge. The slugs which do not pass the gauge are quenched in water and set aside for later recovery. The purpose of this test was to determine if the rejected slugs could be straightened, degreased and recanned by dipping them directly in the bronze and then through the subsequent steps. One hundred and twenty-nine slugs rejected by the warp gauge were straightened, degreased and recanned by dipping directly into the bronze bath, Eleven non-seats and one Al-Si spill over were rejected at the canning pot.The above procedure is recommended as a possible means of treating slugs rejected in the canning operation because of wrap.},
doi = {10.2172/10167659},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Fri Apr 20 00:00:00 EDT 1945},
month = {Fri Apr 20 00:00:00 EDT 1945}
}
-
Strains are introduced into bars by cold working in the straightening operation. If no treatment is applied to relieve the strains after the straightening operation, it is conceivable that they may be relieved in the canning process and cause warped slugs. The purpose of this test was to see if fewer non-seats would occur among slugs machined from bars that were outgassed after straightening. Seven hundred and thirty-five slugs from bars that were straightened before outgassing were caned by the standard procedure. One percent non-seats and 1.9% wrinkled cans were noted at the canning pot. It is recommended that allmore »
-
Technical Department report on Production Test No. 313-58-M: Recovery of lead dipped slugs
A number of slugs have been dipped in lead, then Al-Si and canned. Laboratory experiments showed that the can and outer bonding layers could be removed by the standard caustic-nitrate treatment. The alloy layer was removed from several slugs by hot nitric acid without use of hydrofluoric acid. It was desired to extend the method to the plant process and to clean accumulated lead dipped pieces. Lead dipped slugs may be cleaned by the regular recovery process with a weight loss of about 0.03 lbs. per slug. Attempts to modify or shorten the procedure were not successful. Twenty-four (24) ofmore »