Commissioning results from the recently upgraded RHIC LLRF system

Conference ·
OSTI ID:1016659
During RHIC Run 10, the first phase of the LLRF Upgrade was successfully completed. This involved replacing the aging VME based system with a modern digital system based on the recently developed RHIC LLRF Upgrade Platform, and commissioning the system as part of the normal RHIC start up process. At the start of Run 11, the second phase of the upgrade is underway, involving a significant expansion of both hardware and functionality. This paper will review the commissioning effort and provide examples of improvements in system performance, flexibility and scalability afforded by the new platform. The RHIC LLRF upgrade is based on the recently developed RHIC LLRF Upgrade Platform. The major design goals of the platform are: (1) Design a stand alone, generic, digital, modular control architecture which can be configured to satisfy all of the application demands we currently have, and which will be supportable and upgradeable into the foreseeable future; and (2) It should integrate seamlessly into existing controls infrastructure, be easy to deploy, provide access to all relevant control parameters (eliminate knobs), provide vastly improved diagnostic data capabilities, and permit remote reconfiguration. Although the system is still in its infancy, we think the initial commissioning results from RHIC indicate that these goals have been achieved, and that we've only begun to realize the benefits the platform provides.
Research Organization:
Brookhaven National Laboratory (BNL) Relativistic Heavy Ion Collider
Sponsoring Organization:
DOE - OFFICE OF SCIENCE
DOE Contract Number:
AC02-98CH10886
OSTI ID:
1016659
Report Number(s):
BNL--94207-2011-CP; KB0202011
Country of Publication:
United States
Language:
English

Similar Records

Concept and architecture of the RHIC LLRF upgrade platform
Conference · Mon Mar 28 00:00:00 EDT 2011 · OSTI ID:1016660

A bunch to bucket phase detector for the RHIC LLRF upgrade platform
Conference · Mon Mar 28 00:00:00 EDT 2011 · OSTI ID:1016658

Commissioning and performance of the BNL EBIS LLRF system
Conference · Mon Mar 28 00:00:00 EDT 2011 · OSTI ID:1012575