Poison patterns for counteracting rod failures

Technical Report ·
DOI:https://doi.org/10.2172/10162314· OSTI ID:10162314
This report contains the calculation of the number and spacing of poison columns required to hold a 105 pile in the following cases: (1) complete failure of horizontal rods, (2) complete failure of all rods. Using 10% Cd 90% Pb poison columns of 1.44 inch diameter, it is found that 17 poison columns are required to hold the pile in case of complete failure of horizontal rods, and 65 poison columns are required to hold the pile in case of complete failure of all rods.
Research Organization:
General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-76RL01830
OSTI ID:
10162314
Report Number(s):
HW--7-6433; ON: DE94014376
Country of Publication:
United States
Language:
English

Similar Records

Temperature moments vs poison moments
Technical Report · Mon May 19 00:00:00 EDT 1947 · OSTI ID:10162329

POISON ROD REQUIREMENTS FOR A SOLID-FUEL LEACHER TANK
Technical Report · Sat Feb 28 19:00:00 EST 1959 · OSTI ID:4286808

Horizontal control rods for ``C`` Reactor
Technical Report · Mon May 21 00:00:00 EDT 1951 · OSTI ID:10119352