High Pressure Coolant Injection system risk-based inspection guide for Hatch Nuclear Power Station
- Brookhaven National Lab., Upton, NY (United States)
A review of the operating experience for the High Pressure Coolant Injection (HPCI) system at the Hatch Nuclear Power Station, Units 1 and 2, is described in this report. The information for this review was obtained from Hatch Licensee Event Reports (LERs) that were generated between 1980 and 1992. These LERs have been categorized into 23 failure modes that have been prioritized based on probabilistic risk assessment considerations. In addition, the results of the Hatch operating experience review have been compared with the results of a similar, industry wide operating, experience review. This comparison provides an indication of areas in the Hatch HPCI system that should be given increased attention in the prioritization of inspection resources.
- Research Organization:
- Nuclear Regulatory Commission, Washington, DC (United States). Div. of Systems Safety and Analysis; Brookhaven National Lab., Upton, NY (United States)
- Sponsoring Organization:
- Nuclear Regulatory Commission, Washington, DC (United States)
- DOE Contract Number:
- AC02-76CH00016
- OSTI ID:
- 10159297
- Report Number(s):
- NUREG/CR-6014; BNL-NUREG-52367; ON: TI93014063; TRN: 93:020840
- Resource Relation:
- Other Information: PBD: May 1993
- Country of Publication:
- United States
- Language:
- English
Similar Records
High Pressure Coolant Injection (HPCI) system risk-based inspection guide: Pilgrim Nuclear Power Station
High Pressure Coolant Injection (HPCI) system risk-based inspection guide: Pilgrim Nuclear Power Station
Related Subjects
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS
HATCH-1 REACTOR
HIGH PRESSURE COOLANT INJECTION
RISK ASSESSMENT
HATCH-2 REACTOR
REACTOR COOLING SYSTEMS
REACTOR SAFETY
FAILURES
INSPECTION
REACTOR COMPONENTS
REACTOR ACCIDENTS
220900
210100
POWER REACTORS
NONBREEDING
LIGHT-WATER MODERATED
BOILING WATER COOLED