Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Strom Thurmond Biomedical Research Center at the Medical Univesity for South Carolina Charleston, South Carolina

Technical Report ·
DOI:https://doi.org/10.2172/10156833· OSTI ID:10156833
The Department of Energy (DOE) has prepared an Environmental Assessment (EA) evaluating the proposed construction and operation of the Strom Thurmond Biomedical Research Center (Center) at the Medical University of South Carolina (MUSC), Charleston, SC. The DOE is evaluating a grant proposal to authorize the MUSC to construct, equip and operate the lower two floors of the proposed nine-story Center as an expansion of on-going clinical research and out-patient diagnostic activities of the Cardiology Division of the existing Gazes Cardiac Research Institute. Based on the analysis in the EA, the DOE has determined that the proposed action does not constitute a major federal action significantly affecting the quality of the human environment within the meaning of the NEPA. Therefore, the preparation of an Environmental Impact Statement is not required.
Research Organization:
USDOE Chicago Operations Office, Argonne, IL (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
OSTI ID:
10156833
Report Number(s):
DOE/EA--0893; ON: DE94013091; NC: NONE
Country of Publication:
United States
Language:
English