Uranium Mill Tailings Remedial Action Project (UMTRAP), Rifle, Colorado: Phase 2, Construction drawings [Engineering Materials]
This document consists of engineering drawings related to the remedial action of the Old Rifle Processing site, the New Rifle Processing site, and the Estes Gulch disposal site. This report is intended to accompany report DOE/UMTRA--050506 volume 3, appendix F.
- Research Organization:
- USDOE Albuquerque Field Office, NM (United States). Uranium Mill Tailings Remedial Action Project Office; Morrison-Knudsen Engineers, Inc., San Francisco, CA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- FC04-82AL16257
- OSTI ID:
- 10153603
- Report Number(s):
- CAPE--3054; ON: TI93012988
- Country of Publication:
- United States
- Language:
- English
Similar Records
Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado: Final report
Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado: Final report. Volume 3, Appendix F, Final design, specifications, and drawings
Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado
Technical Report
·
Fri Jan 31 23:00:00 EST 1992
·
OSTI ID:6555814
Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado: Final report. Volume 3, Appendix F, Final design, specifications, and drawings
Technical Report
·
Fri Jan 31 23:00:00 EST 1992
·
OSTI ID:10161127
Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado
Technical Report
·
Fri Jan 31 23:00:00 EST 1992
·
OSTI ID:6644360