skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Comprehensive report to Congress, Clean Coal Technology program: Pinon Pine IGCC Power Project

Technical Report ·
OSTI ID:10151848

The objective of the proposed project is to demonstrate an advanced IGCC system based upon the air-blown, fluidized-bed KRW gasifier with in-bed desulfurization using limestone sorbent and an external fixed- bed zinc ferrite sulfur removal system. Sierra Pacific Power Company (SPPC) requested financial assistance from DOE for the design, construction, and operation of a nominal 800 ton-per-day (86-Megawatt gross), air blown integrated gasification combined-cycle (IGCC) demonstration plant. The project, named the Pinon Pine IGCC Power Project, is to be located at SPPC`s Tracy Station, a power generation facility located on a rural 400-acre plot about 17 miles east of Reno. The demonstration plant will produce electrical power for the utility grid. The project, including the demonstration phase, will last 96 months at a total cost of $269,993,100. DOE`s share of the project cost will be 50 percent, or $134,996,550.

Research Organization:
USDOE Assistant Secretary for Fossil Energy, Washington, DC (United States). Office of Clean Coal Technology
Sponsoring Organization:
USDOE, Washington, DC (United States)
OSTI ID:
10151848
Report Number(s):
DOE/FE-0255P; ON: DE92015632; NC: NONE
Resource Relation:
Other Information: PBD: Jun 1992
Country of Publication:
United States
Language:
English