Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Installation and routing of critical embedments at the Hanford Waste Vitrification Plant

Technical Report ·
OSTI ID:10149237
 [1]; ;  [2]
  1. Westinghouse Hanford Co., Richland, WA (United States)
  2. Waste Chem Corp., Irvine, CA (United States)

The Hanford Waste Vitrification Plant (HWVP) is being designed by Fluor Daniel. Waste Chem Corporation is providing specialized expertise as Fluor Daniel`s major subcontractor for vitrification and remote systems technologies. Westinghouse Hanford Company (Westinghouse Hanford) is the Project Integration manager and Business manager, and as the plant operator it provides technical direction to the Architect/Engineer team and constructor on behalf of the US Department of Energy, Richland Field Office. The Hot Cell portion of HWVP Vitrification Building contains very congested piping systems in the walls that penetrate in to the cells to nozzles for remote piping jumper assemblies. These nozzles require very tight tolerances to ensure a leak-tight fit to the jumpers. An approach has been developed that minimizes the time and expense of installing these nozzles in the wall to tight construction tolerances. This approach is called the Ganged Embed Plate (GEP) design.

Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-87RL10930
OSTI ID:
10149237
Report Number(s):
WHC-SA--1734; ON: DE93011940
Country of Publication:
United States
Language:
English